Reports
Relevant documents will be made available for viewing on this website as the project progresses.
Design and Construction Report (DCR)
The Notice of DCR Filing was sent to contacts on the project mailing list on March 10, 2020, and published in the Turtle Island News and Two Row Times on March 11, 2020, and The Sachem on March 12, 2020. Please note the DCR was available for public review at the new Haldimand County Administration Office at 53 Thorburn Street South and not at 45 Munsee Street North as advertised in the three newspapers. A copy of the notice is available here.
The DCR was available for a 30-day review period from March 11, 2020 until April 10, 2020. A copy of the report is available below.
Design and Construction Report – PDF (4.17 MB)
- Appendix A – PDF (24.2 MB)
- Appendix B – PDF (235 KB)
- Appendix C – PDF (7.20 MB)
- Appendix D – PDF (2.98 MB)
The public review period for the DCR ended on April 10, 2020.
The DCR is not eligible for a Part II Order (i.e. “bump-up”) under the provisions of the Ontario Environmental Assessment Act.
Grand River Argyle Street Bridge Caledonia, Haldimand County Long-Term Strategy
Transportation Environmental Study Report (October 16, 2009)
- Appendix 1 – Photos
- Appendix 2 – Detailed Bridge Condition Survey Report
- Appendix 3 – Underwater Inspection Report
- Appendix 4 – Original Bridge Drawings
- Appendix 5 – Back Plan, Profile, and Lane Configuration
- Appendix 6 – Utility Plans
- Appendix 7 – Traffic Study Report, Argyle Street Bridge
- Appendix 8 – Foundation Investigation Report
- Appendix 9 – Revised Profile of Bridge
- Appendix 10 – Preliminary Bridge General Arrangement Drawings and Construction Staging
- Appendix 11 – Structural Design Report (Replacement)
- Appendix 12 (1) – Fisheries Existing Conditions Report
- Appendix 12 (2) – Environmental Existing Conditions Report
- Appendix 13 (1) – Stage 1 Archaeological Assessment Report
- Appendix 13 (2) – Stage 2 Archaeological Assessment Report
- Appendix 14 (1) – Heritage Bridge Impact Assessment Report 2005
- Appendix 14 (2) – Heritage Impact Assessment Report (Consolidated Report), Revised May 2009
- Appendix 15 (1) – Context Sensitive Design Workshop Background Information
- Appendix 15 (2) – Context Sensitive Design Summary Report
- Appendix 16 (1) – Ministry, Agency, and Municipal Consultation Summary
- Appendix 16 (2) – First Nations and Métis Letters, December 2007
- Appendix 16 (3) – First Nations and Métis Letters, September 2009
- Appendix 17 – Public Information Centre #1
- Appendix 18 – Public Information Centre #2
- Appendix 19 – Public Information Centre #3
- Appendix 20 – Computer Rendering Images
- Appendix 21 – Hydraulic Analysis Report
- Appendix 22 – Construction Cost Breakdown
- Appendix 23 – Evaluation Factor Weighting Workshop Report
- Appendix 24 – Haldimand County Traffic Study Report
- Appendix 25 – Study Plan to Continue the Preliminary Design and Class Environmental Assessment Study for The Argyle Street Bridge
- Appendix 26 – Net Effects Table
- Appendix 27 – Phase 2 Study Alternatives – Details